FM 428 in Collin County

The Texas Department of Transportation (TxDOT) is proposing to improve FM 428 from Dallas Parkway to SH 289 (Preston Road) in Collin County, Texas. The project consists of the realignment and widening of FM 428 from Dallas Parkway to SH 289 (Preston Road) within the City of Celina for a distance of approximately 1.8 miles. The proposed improvements would include a four 12-foot-wide lanes (ultimate six) with an 18-foot-wide raised median, and 10-foot-wide sidewalks along both sides of the road within a variable right-of-way (ROW) width ranging from 138- to 348 feet. This would require 18 acres of new ROW, and could potentially displace three residents and one non-residential building.  There will be a virtual public meeting from February 10th, 2022 until February 25th, 2022 accessible through the project’s online project page on the TxDOT website.  There is also an in-person option on February 10th at 6pm at the Celina Campus (2505 Kinship Parkway Celina, Texas 75009) of Collin College in Room 110. 

Widening FM 1461

The Texas Department of Transportation (TxDOT) will be reconstructing and widening FM 1461 from SH 289 to CR 166 within the cities of Celina, McKinney, and Proper in Collin County. The currently right of way (ROW) is 90 feet wide while the proposed ROW is 172 feet wide. It is estimated that an approximate 100 parcels will be affected by this ROW expansion.  The project has completed its environmental assessment, and is now in the process of acquiring the necessary ROW. Construction is anticipated to begin in 2025.