SH 332 in Brazoria County is soon to be improved by TxDOT. The roadway project is 5.3 miles in length and spans from FM 521 to SH 288. The project includes three major improvements. The first improvement will occur at the stretch of the road from FM 521 to FM 2004 and will include the reconstruction and widening of the roadway from two to four lanes. The second major improvement targets SH 332 from FM 2004 to SH 288. This section of the road will be widened from four to six lanes. The third major improvement will be the reconstruction of the bridge over Buffalo Camp Bayou. The project also includes some minimal improvements, namely the construction of sidewalks and a new drainage channel.
TxDOT is in the final stages of their plans for SH 332. The final Environmental Assessment and Finding of No Significant Impact (FONSI) were released in the fall of 2020. The next step for the project will be the acquisition of right-of-way. The project would require approximately 70.4 acres of additional right-of-way. After right-of-way acquisition, TxDOT will start construction.
