TxDOT will be making major improvements to FM 664 in Ellis County. The changes to the Ellis County roadway are occurring as two distinct TxDOT projects, although both are following similar timelines. The more expansive of the two projects is TxDOT’s plans for the segment of FM 664 from IH 35E in Red Oak to IH 45 south in Ferris.
The plans for the 9.96 mile stretch of FM 664 will expand the current two to four lane roadway into a six lane roadway. Additionally, two new interchanges and one new bypass will be built. One of the interchanges will be will be constructed at IH 35E from Red Oak to Tater Brown Road and the other will be at IH 45 from the IH 45 crossover to E. 8th Street. The new bypass will be located south of the City of Ferris in order to connect to the new interchange at IH 45.
The project received final environmental clearance in the spring of 2020. The next step for TxDOT is the acquisition of right-of-way (ROW). TxDOT is planning to acquire 164 acres of new ROW, which is anticipated to displace 17 residential structures and 10 commercial properties.
