US 29/SH 36 Interchange – Central Direct Connect

The Texas Department of Transportation (TxDOT) will be making improvements to the intersection of US 290 at SH 36 in Brenham, Texas in a planned project called US 290/SH 36 Interchange – Central Direct Connect. TxDOT originally considered three concepts that were presented and shared with Brenham City Council and Washington County Commissioners Court. Based on feedback from the City and County, TxDOT developed two additional concepts for a total of five concepts. In Spring of 2021, TxDOT announced that Revised Concept B – Central Direct Connect was the selected alternative for further development. All concepts include the following: (i) the expansion of US 290 at SH 36 connection from one to two lanes; (ii) convert frontage roads one-way; (iii) update the entrance and exit ramps to current standards; and (iv) accommodating bicyclists and pedestrians within the urban settings.

TxDOT is anticipating a Public Hearing early 2023. TxDOT is currently undergoing its environmental review process which is an essential part to a finalized route. See the timeline below for anticipated dates of right of way acquisition (expected 2024-2025) and construction start date (expected 2026).

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s